Passenger Ship for an English Tourist Corporation

  • Focus: Partially corroded and blocked „Scupper“ lines (deck drainage)
  • Welded steel pipes – DN 80-150

This project involved a ship that was over 30 years old. The task was carried out in the dry dock in Cádiz. It was initially planned to renovate 200 meters of pipes, but during the inspection, many more blocked pipes were discovered. Only after clearing the lines and conducting camera inspections were various leaks identified. The project had a tight schedule, with only two weeks available at the end of the shipyard period.